Free HS&E test practice for managers and professionals

Twenty original multiple-choice questions for the CITB health, safety and environment test for managers and professionals. Work through them one at a time with a clock running, flag the ones you are unsure of, then get your score by section with every answer explained. No sign-up, no email.

The questions cover the five areas CITB lists for the test: legal and management; occupational health, wellbeing and welfare; general safety, high risk activities; and environment. They are pitched at people in management and professional roles: duties under CDM 2015, RIDDOR, notifications, planning and the controls a manager has to put in place.

Every explanation names its source, the regulation on legislation.gov.uk or the HSE guidance it comes from, so you can read further on anything you get wrong.

These are our own practice questions, written from HSE guidance and UK legislation. They are not questions from the real test. CITB publishes the current format and pass mark: check them on CITB’s managers and professionals test page before you book.

The practice test

1. Under the Construction (Design and Management) Regulations 2015, a project must be notified to HSE when the construction work is scheduled to:

Legal and management

Show answer

Answer B: last more than 30 working days with more than 20 workers at once at any point, or exceed 500 person days

Regulation 6 sets the two notification tests: over 30 working days with over 20 workers working simultaneously at any point, or over 500 person days. Demolition and having several contractors do not by themselves make a project notifiable.

Source: CDM 2015 reg 6 (legislation.gov.uk); HSE L153

2. On a notifiable project for a commercial client, who must send the notification (form F10) to HSE under CDM 2015?

Legal and management

Show answer

Answer B: The client

Regulation 6 places the duty to notify on the client, before the construction phase begins. The client may ask someone else to send it, but the duty stays with the client. On a domestic project the duty passes to a contractor under regulation 7.

Source: CDM 2015 regs 6 and 7 (legislation.gov.uk); HSE L153

3. An injured worker cannot do their normal work for more than seven consecutive days, not counting the day of the accident. Under RIDDOR 2013, the injury must be reported:

Legal and management

Show answer

Answer D: within 15 days

Over-seven-day incapacitation must be reported within 15 days of the accident. Hospital admission is not the test for workers. Deaths and specified injuries are reported without delay, with a report within 10 days.

Source: RIDDOR 2013 reg 4 and Schedule 1 (legislation.gov.uk); HSE INDG453

4. A worker knows the rule is to isolate a machine before clearing a jam, but skips it on purpose to save time. In HSE's guidance on human failure (HSG48), this is:

Legal and management

Show answer

Answer C: a violation

Slips and lapses are unintended errors of action or memory. A mistake is a wrong decision made in the belief it is right. A deliberate breach of a known rule is a violation.

Source: HSE HSG48 Reducing error and influencing behaviour

5. Under the Control of Noise at Work Regulations 2005, the lower exposure action value for daily personal noise exposure is:

Occupational health, wellbeing and welfare

Show answer

Answer B: 80 dB(A)

The lower action value is 80 dB(A), with a peak of 135 dB(C). 85 dB(A) is the upper action value, and 87 dB(A) is the exposure limit value.

Source: Control of Noise at Work Regulations 2005 reg 4 (legislation.gov.uk); HSE L108

6. Blocks need cutting on site, which will create silica dust. Under COSHH, which approach should be looked at first?

Occupational health, wellbeing and welfare

Show answer

Answer A: Avoid the cutting, for example by ordering blocks cut to size

COSHH regulation 7 requires exposure to be prevented first where reasonably practicable. Only then do controls apply, such as water or extraction, with respiratory protection as the last line of defence. A warning sign controls nothing, and rotation only shares the exposure out.

Source: COSHH 2002 reg 7 (legislation.gov.uk); HSE L5

7. HSE's Management Standards for work-related stress cover which six areas?

Occupational health, wellbeing and welfare

Show answer

Answer B: Demands, control, support, relationships, role and change

The Management Standards look at how work is designed and managed: demands, control, support, relationships, role and change.

Source: HSE Management Standards (hse.gov.uk/stress/standards/overview.htm); MHSWR 1999 reg 3

8. Under the Manual Handling Operations Regulations 1992, what is the first step for an employer?

Occupational health, wellbeing and welfare

Show answer

Answer C: Avoid hazardous lifting and moving where reasonably practicable

Regulation 4 sets the order: avoid, then assess what cannot be avoided, then reduce the risk. The 25 kg figure is an HSE guideline filter, not a legal limit, and training comes after avoiding and assessing the risk.

Source: Manual Handling Operations Regulations 1992 reg 4 (legislation.gov.uk); HSE L23, INDG143

9. An electrician will work on a circuit that has been made dead. The Electricity at Work Regulations 1989 require:

General safety

Show answer

Answer D: precautions to stop it being re-energised, such as locking off

Regulation 13 requires adequate precautions to stop the equipment becoming electrically charged during the work. That means secure isolation, locking off and proving dead. A sign or a switch position alone can be undone by someone else.

Source: Electricity at Work Regulations 1989 reg 13 (legislation.gov.uk); HSE HSG85

10. What is the most effective way to stop people being struck by vehicles on site?

General safety

Show answer

Answer D: Keep pedestrians and vehicles apart, with separate routes

HSG144 puts segregation first, because it removes the chance of contact. Hi-vis, horns and speed limits help but still leave people and vehicles in the same space.

Source: HSE HSG144 The safe use of vehicles on construction sites

11. A worker will be working alone in a basement plant room. Which control matters most in planning the job?

General safety

Show answer

Answer C: A way of checking on them and raising the alarm

HSE's lone working guidance focuses on keeping in contact, checking on the worker and planning how to get help to them. Lone working is not illegal, but its risks must be assessed and controlled.

Source: HSE INDG73 Protecting lone workers; MHSWR 1999 reg 3

12. Children are reported playing on a site after hours. Under CDM 2015, those managing the site must:

General safety

Show answer

Answer D: take reasonable steps to stop unauthorised people getting onto the site

Regulations 13(4)(b) and 15(10) include preventing unauthorised access, and the risk to children is foreseeable. Typical measures are secure fencing, immobilised plant, and ladders removed or secured in a compound. No particular fence type is required by law.

Source: CDM 2015 regs 13(4)(b) and 15(10) (legislation.gov.uk); HSE HSG151 Protecting the public

13. In the Work at Height Regulations 2005, what is the correct order of the hierarchy of control?

High risk activities

Show answer

Answer A: Avoid work at height, prevent falls, then minimise the distance and consequences

Regulation 6 requires work at height to be avoided where reasonably practicable. Where it cannot be avoided, falls must be prevented. Only then should equipment such as nets or harnesses reduce the distance and consequences of a fall.

Source: Work at Height Regulations 2005 reg 6 (legislation.gov.uk); HSE INDG401

14. Under Schedule 2 of the Work at Height Regulations 2005, on construction work, the largest unprotected gap allowed between the top guard-rail or intermediate guard-rail and the toe board is:

High risk activities

Show answer

Answer A: 470 mm

Schedule 2 limits any unprotected gap between rails to 470 mm on construction work, so a person cannot fall through between them.

Source: Work at Height Regulations 2005 Schedule 2 (legislation.gov.uk)

15. Before digging near buried services, HSE guidance HSG47 says you should:

High risk activities

Show answer

Answer B: get service plans and trace with a cable locator, then hand-dig trial holes

HSG47 combines plans, locating devices and safe digging. Plans are not exact, warning tape may be missing, and picks can easily puncture cables.

Source: HSE HSG47 Avoiding danger from underground services

16. Under the Confined Spaces Regulations 1997, emergency rescue arrangements must be:

High risk activities

Show answer

Answer D: in place before anyone enters the confined space

Regulation 5 requires suitable rescue arrangements before entry. Relying on the emergency services alone is not enough, and would-be rescuers without a plan often become further casualties.

Source: Confined Spaces Regulations 1997 reg 5 (legislation.gov.uk); HSE L101

17. Refurbishment will disturb the fabric of an office built in 1985. Before work starts, HSE's asbestos survey guide says you need:

High risk activities

Show answer

Answer C: a refurbishment and demolition survey of the areas to be worked on

Buildings built before 2000 may contain asbestos. A management survey is for normal occupation. Work that disturbs the fabric needs a refurbishment and demolition survey first, so materials can be found and dealt with.

Source: Control of Asbestos Regulations 2012 reg 5 (legislation.gov.uk); HSE HSG264 Asbestos: the survey guide

18. Under the waste duty of care, a contractor that produces waste must make sure it is:

Environment

Show answer

Answer A: passed only to an authorised person, with a written description

Section 34 of the Environmental Protection Act 1990 requires waste to be kept secure, passed only to an authorised person such as a registered carrier, and described in writing. Regulation 35 of the Waste (England and Wales) Regulations 2011 sets out what the written information must contain. Burning waste on site can be an offence in itself.

Source: Environmental Protection Act 1990 s.34; Waste (England and Wales) Regulations 2011 reg 35 (legislation.gov.uk)

19. Under the Control of Pollution (Oil Storage) (England) Regulations 2001, the minimum capacity of the secondary containment (bund) for an oil tank is:

Environment

Show answer

Answer C: 110% of the tank's capacity

Regulation 3 requires the bund to hold at least 110% of the tank's capacity. Where there is more than one container, it must hold the greater of 110% of the largest or 25% of their total. Under regulation 2 the Regulations do not cover containers of 200 litres or less.

Source: Control of Pollution (Oil Storage) (England) Regulations 2001 regs 2 and 3 (legislation.gov.uk)

20. Bats are found roosting in a roof void that is due to be refurbished. What should happen?

Environment

Show answer

Answer A: Stop work there and get an ecologist's advice, as a licence may be needed

All bat species are European protected species. Damaging or destroying a roost is an offence at any time of year. A licence from the nature conservation body may be needed before work can go ahead.

Source: Conservation of Habitats and Species Regulations 2017 regs 43 and 55 (legislation.gov.uk)

Your score

Open Show answer under each question to check it. Turn on JavaScript to use the simulator, with a clock and your score by section.

Independent publication. Not produced, endorsed or approved by CITB or CSCS. Contains public sector information licensed under the Open Government Licence v3.0.